
26m Upgraded Truss-Type Bridge Inspection Vehicle
26m Upgraded Truss-Type Bridge Inspection Vehicle manufactured by Yutong Heavy Industries.
View Details
For high of under-bridge reach, the 26 m pairs its boom and platform system with a carrier layout that keeps the inspection crew on deck all day.
Under-bridge reach of 26 m covers the span band this vehicle is specified for.
| / | CA1320P62K1L6T4E6Z |
|---|---|
| / | FAWDE CA6DK2D35E65 |
| mm | 2000+4500+1350 |
| kW/PS | 257/350 |
| mm | 14770×2550×3960 |
| kg | 32000 |
| / | China VI |
| km/h | 115 |
| m | 0-26 |
| m | 8.5 |
| m | 3.7 |
| m | 5 |
| kg | 800 |
| kg | 400 |
| ° | 0-90 |
| ° | 0-180 |
| / | Hydraulic Transfer Case Drive |
| m/min | 15 |
The 26m pairs 26 m of under-bridge reach with a the matched platform on a a matched wheelbase and the matched rated power — a combination that lets inspection crews reach girder and bearing zones all day from one positioning.
Platform rails, tie-off points and the carrier are matched in the factory: the unit is tested with the platform loaded at rated reach, and the operating envelope is documented so site teams know exactly where the crew can work and where the counterweight stays.
For the 26m, Yutong confirms reach, platform and carrier against your bridge list before production, then supports the unit with spares, operator training and field service across the markets it is exported to.

26m Upgraded Truss-Type Bridge Inspection Vehicle manufactured by Yutong Heavy Industries.
View Details
26m 3-Section Platform Bridge Inspection Vehicle manufactured by Yutong Heavy Industries.
View Details
23m Truss-Type Bridge Inspection Vehicle manufactured by Yutong Heavy Industries.
View Details
23-26m Truss-Type Bridge Maintenance Vehicle manufactured by Yutong Heavy Industries.
View DetailsThe 26m Truss-Type Bridge Inspection Vehicle provides under-bridge access typically ranging from 2 to 8 meters below the deck, with horizontal reach of 18 to 26 meters depending on the model. This covers the majority of highway overpasses and railway bridges in service.
The platform supports visual inspection, ultrasonic testing, crack measurement, bearing inspection, concrete sampling, and light maintenance work such as sealing joints and cleaning drainage systems. It can also accommodate small tools and non-destructive testing equipment.
Setup time typically takes 15-30 minutes, including positioning the truck, deploying outriggers, and extending the platform. The vehicle can then be repositioned along the bridge length as needed for comprehensive inspection coverage.
Yes, specialized configurations are available for cable-stayed and arch bridges. These models feature extended reach and flexible articulation to access stay cables, pylons, and under-deck structures that standard platforms cannot reach.
Operation is typically limited to wind speeds below 13.8 m/s (Beaufort 7). The platform includes anemometer monitoring and automatic locking to secure the platform in high wind conditions.
Operators should hold appropriate commercial driver's licenses and complete manufacturer-specific training on the platform operation, safety procedures, and emergency protocols. Yutong provides on-site training with each vehicle delivery.
Yutong Heavy Industries exports construction machinery to over 60 countries across Asia, Africa, the Middle East, South America, and Eastern Europe. We have established dealer and service networks in major markets. Contact us to confirm availability in your region.